House #1 Bathroom Renovation

by Ryan

The bathroom at House #1 is tiny. The dimensions are:

The bathroom was complately ripped down to the studs, the only thing that was left was the original toilet and bathtub.

Before and After Photo

Flickr Photo Gallery

Bathroom Renovations:
Step 1 – Rip out old drywall
Step 2 – Update plumbing behind the shower
Step 3 – Install new outlet fixtures
Step 4 – Install drywall and durarock
Step 5 – Rip out subfloor
Step 6 – Install new subflooring
Step 7 – Install porcelin tile shower surround and floor
Step 8 – Plaster and paint walls
Step 9 – Install Vanity, Shower, Toilet
Step 10 – Finish up with details.

Project Articles:
How I chose the ceramic tile for House #1
Tiling a shower surround around a bathroom window
5 Things I learned about choosing ceramic tile

Total Cost Breakdown of the Bathroom
New drywall and durarock –
New electric fixtures –
Porcelin Tile –
Shower Inlet –
Grout –
Plaster –
Paint –
New Vanity –
New Mirror –

Related Posts with Thumbnails
If you enjoyed this post, make sure you subscribe to my RSS feed!

Leave a Comment

CommentLuv badge

Previous post:

Next post: